As DMS Dental, we delivered an advanced dental infrastructure project at the Bahçeşehir University Faculty of Dentistry campus, meeting the highest requirements of modern medical education. This project is an end-to-end engineering achievement—managed entirely by DMS expertise from design and mechanical installation to equipment placement and commissioning.
The key differentiator of the BAU project is that it was structured with BIM technology from the very beginning:
Digital Twin & 3D Modeling:
All dental infrastructure networks were modeled in 3D on the building’s digital twin. This enabled potential clashes between mechanical installation, electrical, and ventilation systems (clash detection) to be identified and resolved digitally—before construction began.
Mechanical Installation Execution:
Based on AutoCAD and BIM data, the technical infrastructure was implemented with millimeter-level precision. Every detail—from pipe diameters to slope calculations—was optimized to ensure high efficiency and reliable operation for decades.
Integrated Infrastructure Implementation:
Lines running from the system room to clinical departments were installed without compromising the faculty’s architecture, combining aesthetics and functionality through disciplined engineering.
To support intensive clinical traffic and academic operations, the following industrial-grade solutions were implemented:
Uninterrupted Medical Air Supply:
With 2 DMS Central Dental Compressor Systems, the faculty is supplied with 100% oil-free, dry, medical-grade air. The redundant operating structure maximizes system continuity.
High-Performance Vacuum Network:
Vacuum power was established across all surgical and treatment units through the installation of:
1 DMS Central Dental Aspirator System (High Capacity)
1 DMS Central Dental Aspirator System (Medium Capacity)
This ensures stable, loss-free vacuum performance throughout the facility.
Leadership in Digital Design:
Our BIM-based design capability aligned perfectly with the university’s modern campus construction processes, enabling accurate planning and error-free execution.
Turnkey Assurance:
Delivering project design, mechanical installation, and equipment implementation under one responsibility structure eliminated coordination complexity and ensured full system integrity.
MDR Class IIa Certified Domestic Strength:
All domestically manufactured systems used in the project fully comply with international medical device regulations under MDR (EU) 2017/745 Class IIa, supporting the faculty’s high-quality vision.
Project Type: Education & Research Hospital / Faculty of Dentistry
Location: Istanbul
Scope: BIM-Supported Engineering Design, Mechanical Installation Execution, Equipment Installation
Installed Systems:
2 × DMS Central Dental Compressor Systems
2 × DMS Central Dental Aspirator Systems (Different Capacities)
Technology Focus: BIM-supported 3D project design, integrated mechanical solutions, domestic engineering strength.