As DMS Dental, we delivered a high-performance and sustainable infrastructure project at Cappadocia University Dental Hospital, capable of supplying 70 dental units simultaneously. The project covered not only equipment delivery, but also end-to-end technical support—from engineering design to the optimization of the mechanical installation infrastructure.
Uninterrupted and loss-free performance in a 70-unit system requires strong engineering planning behind the scenes:
Digital Technical Design:
All medical air and vacuum lines of the hospital were engineered in AutoCAD and BIM environments, fully aligned with the building’s architectural structure.
Flow & Pressure Calculations:
Flow calculations were carried out with millimeter-level precision to ensure that the line leaving the system room delivers the same pressure and vacuum values even at the most distant clinical unit.
Mechanical Infrastructure Consultancy:
From the beginning of the project, the entire dental mechanical installation infrastructure was designed to maximize efficiency and prevent energy losses.
To support the hospital’s intensive patient flow and academic activities, the following central system solutions were implemented:
Uninterrupted Medical Air Supply:
With the installation of 1 DMS Central Dental Compressor System, all 70 units receive 100% oil-free, dry, and sterile medical air. Smart motor management optimizes air production according to real-time usage intensity.
Stable Vacuum Infrastructure:
With 1 DMS Central Dental Aspirator System, surgical-grade stable vacuum power was established across all treatment and surgical departments. The uninterrupted suction performance enhances operational success and clinician comfort.
MDR Class IIa Certified Domestic Strength:
Our systems—certified under (EU) 2017/745 Class IIa as domestically manufactured solutions in this field—fully comply with the hospital’s quality standards.
Integrated Responsibility:
Having DMS expertise involved at every step—from drawings to mechanical integration and commissioning—provided the university with a safe, long-life system assurance.
Efficiency & Energy Savings:
With digital control panels that distribute system load intelligently, our solutions minimize operating costs and support sustainable hospital management.
Project Type: University Dental Hospital
Location: Cappadocia
Total Capacity: 70 Units
Scope: Engineering Design, Technical Infrastructure Support, Equipment Installation
Installed System Groups:
1 × DMS Central Dental Compressor System
1 × DMS Central Dental Aspirator System
Technology Focus: Precision/zero-error engineering design, high vacuum stability, domestic manufacturing strength.