As DMS Dental, we successfully completed a major infrastructure operation at Mustafa Kemal University Faculty of Dentistry—covering the full scope from engineering design to mechanical installation, water treatment, hygienic HVAC systems, and laboratory equipment setup. This project clearly demonstrates how different technological components can operate in perfect harmony under the umbrella of DMS engineering.
To secure the faculty’s academic and clinical operations, we delivered the following critical engineering services:
BIM & AutoCAD–Supported Engineering Design:
All hospital and laboratory infrastructure, mechanical installation networks, and dental units were digitally modeled as integrated systems, reducing the margin of error to zero.
Hygienic Air Conditioning & Ventilation Systems:
A sterilization-focused Hygienic HVAC System was designed and implemented at surgical and clinical standards to prevent cross-contamination.
Central Water Treatment Facility:
High-capacity water purification systems feeding the entire faculty were installed to ensure long-term performance of dental units and to maintain medical hygiene standards.
Dental Mechanical Installation:
Medical air and vacuum lines were engineered to match the building architecture while maximizing energy efficiency; all piping and infrastructure workmanship were completed to DMS quality standards.
In the Mustafa Kemal University project, DMS’s role as a System Integrator became a key differentiator:
Integration of a Third-Party Vacuum System:
Synchronization and full compatibility of an external brand vacuum system with the faculty’s overall mechanical infrastructure were ensured by DMS engineers.
Technical Supervision:
Air consumption and vacuum flow requirements of different devices were analyzed, and supervision services were provided to ensure the full system operates flexibly under variable load conditions.
Equipment Supply, Installation & Commissioning:
From clinical treatment units to technical laboratory equipment supporting future dentists, the full equipment park was delivered through DMS installation and commissioning expertise.
Preclinical & Phantom Laboratories:
All required laboratory infrastructure and technical equipment were delivered in full, enabling students to receive practical training at the highest standards.
Turnkey Assurance:
Delivering every scope item under one responsibility—from installation and HVAC to water treatment and equipment commissioning—provided strong technical unity and simplified project management.
Engineering Authority:
Our capability to manage and optimize not only DMS products but also third-party systems at high efficiency was a core success factor.
Domestic Strength, International Standards:
DMS’s domestically manufactured solutions certified under MDR Class IIa provided the strongest assurance in support of the university’s quality vision.
Project Type: Turnkey Faculty & Dental Hospital Installation
Location: Hatay
Scope: Engineering Design, Mechanical Installation, Hygienic HVAC & Ventilation, Central Water Treatment, Equipment Installation
Technical Feature: Multi-brand vacuum system integration & supervision
Technology Focus: Hygienic climate management, system integration leadership, fully integrated engineering.